Quality begins before the test starts
Before the actual testing of an air conditioning unit from Liebherr Aerospace and Transportation begins at our Test Institute, careful preparation is already underway behind the scenes. Because quality begins before the test starts.
Our technicians ensure that every detail is right—from goods receipt to commissioning:
• Meticulous goods receipt inspection
• Safe handling of test items using forklifts and indoor cranes with individually manufactured lifting beams
• Precise assembly on the test bench
• Controlled commissioning of propane-filled air conditioning units in a protective enclosure in compliance with the highest safety standards
These careful preparatory steps form the basis of high-quality and reliable test results – a crucial part of every project at our Test Institute.

